Resolved Bugs

< Back | Version 1.1.1 >

Project X v 1.1

Index of features
New Features
Installer
Bug Fixes
Stability
Printing
Interface Changes
Removed Features
The Web App

New Features

  • Breadcrumb trails implemented/ Ability to reach back to parent task using Navigation bar.
  • Resource Leveling has been implemented.
  • Media options are now able on tasks.
  • A “Remove Note” button has been added to the Notes tab in the Inspector.
  • A cancel button now appears in the import window.
  • The default calendar contains US holidays. In order view these, please click on the Restore Default Application Settings button in the Project X General Preferences.
  • Dragging URL’s from the web browser to Documents has been enabled.
  • MPX/MSPDI Import/Export options
  • MPP Import only options

Installer

  • New welcome, license agreement and read me implemented in the Installer.

    Bug Fixes
  • Revert option available in the File menu.
  • Now able to link tasks in the Outline view.
  • The resource order in the Cost/Resources tabs is now correct.
  • Network view work area no longer disappearing after creating and deleting tasks.
  • Using the up/down arrows to edit the date in the project inspector is now functional.
  • Resolved problems moving resources into a meeting invitation.
  • Holidays/Exception days input into the Standard Calendar in Preferences, now display in the calendar for a newly created project.
  • Expand/collapse buttons are now functional in the Track Progress view after first deleting a task in Track Progress view, switching to Network view, adding more tasks there then switching back to Track Progress view.
  • Resolved duration problems after adjusting working hours of an exception.
  • Lead/Lag is now being calculated in the Links tab in the Inspector.
  • Subprojects are calculating duration correctly based on nested tasks.
  • Undo working in Track Progress view.
  • The mouse pointer no longer changes to the resize icon when mousing over holidays, workdays and exception information. The pointer only changes to the resize icon when mousing over column areas.
  • Flat fee is now calculated correctly for resources in the Cost tab.
  • The Web application is now publishing projects containing costs.
  • Deleting links in other views is now refreshing correctly in the Network view.
  • Calendar preferences can now be edited when no documents are open.
  • Links can be deleted after a project is saved and reopened.
  • Document author no longer disappears after modifying resources within a project.
  • Text handles no longer alternate from disappearing and appearing when typing capital letters in the Header Footer View.
  • Fixed problem when modifying line attributes in the Header/Footer view.
  • Linking and unlinking now recalculates the subproject duration correctly.
  • Fixed problem using the “Reopen Projects.
  • Fixed problem using the ”Last open View” preference to:” preference.
  • Day and Week calendars display task hours correctly now.
  • Timeline view now scrolls when dragging tasks ahead in the days view.
  • Drag and drop of Project Manager now works after switching views in the Project Inspector.
  • Task ID displays correctly in nested levels.
  • Network view is now accessible after creating nested tasks in Outline or Timeline view.
  • The Cost, Workload & Efficiency view no longer flickers when scrolling.
  • Sorting dates have been corrected in the Track Progress view.
  • Canceling in Track progress view clears out the fields now.
  • Undo/redo of linked tasks are fixed.
  • Undo/redo of tasks are no longer displaying an expanded view.
  • Percent complete values are now consistent in Track Progress.
  • Actual hours are incorrect after making a submission.
  • Progress bar in the Summary Reports is displaying correctly.
  • Navigation between tasks is no longer out of order.
  • Task name in Outline and Timeline view is now retaining edit status when a new task is added.
  • The “Show Project Inspector At Startup” option is working correctly now.
  • Currency units are displayed correctly when changing the region.
  • The ability to move documents in the Inspector to an unselected task is no longer available
  • Drawing lines in the Header/Footer panel has been fixed.
  • View Options are no longer displaying incorrectly in the Network view when first created in the Timeline or Outline View.
  • Undo/Redo is now working correctly with Tasks.
  • Current Activity Reports are showing tasks properly now.
  • Percent complete value now displays correctly in the Task.
  • Task completion is reflecting properly now.
  • Movies no longer disappear from the Media area on a task after returning back to the parent level using the navigation bar.
  • Restore Default Application is working now.
  • Keyboard constraints are resolved.
  • Project start date honored after changing tabs in the Project Inspector.
  • Media files containing uppercase extensions will attach to the task now.
  • Planned Start date now corresponds to the calendar input when highlighted.
  • Problems selecting dates from the pop-up calendar has been resolved.
  • Show Link Type is remembered when you set as default in View Settings.
  • View Setting now updates to reflect different settings selected across multiple documents.
  • Assigning Fixed Workload through the menu now reflects in the Inspector.
  • Highlighting the Start Date Actuals field when it is inactive is no longer prompting you to save the baseline.
  • The Media option has been added to Task > Add Menu.
  • You are now able to drag a task after a nested task.
  • Project move issues improved.
  • Creating New Groups in the Resource view has been fixed.
  • Deleting New Materials in the Resource view has been fixed.
  • The Move Up/ Move Down menu option is working properly now
  • Task selection problem using the navigator arrows in the Inspector has been resolved.
  • The search field contains a history of searches now.
  • Navigating through tasks using the task inspector has been resolved.
  • Cost updates properly for resources after the resources overtime rate has been changed.
  • Unlinked tasks no longer reflect zero duration for the parent subproject in the Network view.
  • Move Project Dates has been resolved.
  • Resize handles on lines are no longer off center in the Header/Footer view.
  • The ability to change the text color in the Header/Footer view has been resolved.
  • Cut, Copy, Paste menu options are no longer greyed out when switching from the Resource view.
  • Notes no longer disappear in the web app when you switch views.
  • Movement of tasks from finish to finish is no longer causing a conflict.
  • Delete option is no longer greyed out.
  • Planned Finish date of a subproject is no longer displayed incorrectly in the Network view.
  • Start/Finish dates are displaying correctly after assigning a holiday.
  • Import of MPX files from OmniPlan has been resolved.
  • Speed of cutting/pasting tasks between documents has been improved.

    Stability
  • Revert no longer crashes Project X.
  • Deletion of tasks with custom category no longer eats up memory and crashes.
  • Project X is no longer crashing when not saving a baseline when publishing a document.
  • Project X no longer crashes when you open/close the calendar on the Task.
  • Project X no longer crashes after deleting tasks from a recently imported project.
  • Project X no longer crashes when you click on the sync button after opening a project in the Submissions view.
  • Project X no longer crashes when closing or quitting when some default views are set in the “reopen Project to” option in Preferences. All views except Network would crash.
  • Project X no longer crashes after saving/opening documents containing lines in the Header/Footer view.
  • Fixed Validation error when total hours for the planned worked day is low.
  • Project X no longer crashing when importing CSV files containing a cost and income values.
  • Project X is no longer crashing when clicking in the View Setting window when no documents are present.
  • Project X no longer crashing after submitting web app changes after opening/closing documents.
  • Project X no longer crashing when dragging media outside of the task.
  • Validation errors with the Hardware Upgrade template have been resolved.
  • Outdenting tasks no longer causes an exception.
  • Orphan tasks are no longer appearing in the code after deletion.
  • Project X is no longer crashing when placing tasks into conflict.
  • The Basic Commercial Architecture template is no longer crashing.
  • Changing the successor/predecessor type on task is no longer throwing exceptions.
  • Validation error resolved when Task Available percentage is too low.
  • Deleting a linked task then switching to the Summary View is no longer throwing an exception.
  • Selecting nested subprojects then switching to the Network view is no longer throwing an exception.
  • Project X is no longer crashing when importing MPX/MPP files.
  • Project X is no longer crashing when redoing undone nested tasks.
  • Project X is no longer throwing an exception when redoing indented subprojects.
  • Project X is no longer crashing when keeping tasks after deleting the parent task.

    Printing
  • Printing in the Calendar view has been improved.
  • Page Breaks are viewed in Print Preview only.
  • Page range is displayed correctly now in the Project X Print Options dialog.

    Interface Changes
  • The project inspector has the ability to allow users to manually modify tasks attributes once created.
  • Units are now correctly displayed when the region/currency is set to Indian Rupee.
  • It is now easier to select link connectors between tasks/subprojects/milestones.
  • Critical Path is displaying correctly.
  • You are no longer able to draw outside of the visible area in the Header/Footer Window.
  • Attributes such as color, font, style and size can be applied to text in the Header Footer window.
  • The “No Selection” option has been removed from the point size  pop-up in the Header Footer window.
  • Project and resource calendars have updated interface.
  • GUI problem in Preferences regarding “Use template: Blank”, has been resolved.
  • The Over Allocation of resources default is set to 300% now.
  • Message implemented when no licenses are found.
  • Message implemented when the number of available licenses are exceeded.

    Removed Features
  • The Cash Flow option has been removed.
  • You are no longer able to type a value in the percent complete area in a task. This field is for feedback only.
  • The Collaboration section has been removed from the Project Inspector.

    The Web App
  • Web App is now displaying multiple projects per resource.

  • Vcards with company checked can now log in to the Web App.

  • Percent complete is consistent with hours input into the Web App.

  • Previous dates are no longer represented in negative values in the Web App.