< Back | Downloads Page >
Project X v 1.1.2
Index of features
New Features
Bug Fixes
Stability
Removed Features
- An "Import" button has been implemented in the Specs section of the Inspector. You now are able to import TXT, RTF and DOC files.
- The Export menu now specifies CSV for New and Existing Reports.
- “Set Type” option is now grayed out in the Task menu when a task containing resources is selected.
- Selection rectangle redraws correctly when resizing now.
- Custom number field supports more than 7 digits now.
- “Check Spelling As You Type” option no longer appears twice in Project X.
- Font color and style are now saved on text when you close/reopen a project.
- Font size is not is now saved in the Specs and Notes sections of the Inspector when you close/reopen a project.
- Instances of "No selection" have been removed from the Task Inspector.
- Estimated Expense now updates when you change the rate type of the resource.
- Resource cost has been corrected after changing the duration.
- Overtime is now calculating properly.
- You no longer have to hit the Close button twice in order for the Project Inspector to close after changing the Planned Start of a project with actuals.
- Invisible Links are no longer being displayed in Gantt view.
- You are no longer able to indent tasks and subprojects containing resources.
- Milestone’s now display the correct planned date after you Move Project.
- An e-mail is no longer being sent every time you cycle through the “Email project to-do lists for:” pop-up button in the Publish options screen.
- Planned work hours now change when the Calendar is changed for preexisting tasks.
- Sub menus in the Task menu are disabled in all Reports Views.
- Refresh problem is no longer occurring when adding work hours for exception dates.
- Tasks creation is incorrect after you undo a task made as an exception day on the weekend.
- Fixed bugs associated with the cost controller.
- Duration no longer displays a null value when you delete it and tab out.
- Blank entries are no longer occurring when assigning when importing projects from another computer.
- Estimated work and work duration is now equally distributed to resources when the task has a fixed workload.
- Hours now change to reflect selected calendar.
- Now able to save when a task activity has no task associated.
- The “Add holidays and non-work days below” section dates has been resolved.
- User is now notified when a "me card" is not present when setting activity.
- Percent Complete value now updates when task duration is increased.
- Subproject start dates reflect the correct date when the link is removed.
- Finish dates of empty subprojects are now calculating correctly.
Stability
- Project X no longer crashes when trying to update the duration after editing the working calendar.
- An exception is no longer occurring when performing a search in the Submissions view after sync-ing from the web app.
- An exception is no longer occurring when rejecting a submission.
- An exception is no longer occurring when deleting materials in the Project Resource Panel.
- An exception no longer occurs when selecting Weeks and Days in the Calendar view.
- “Edit Categories” under the Task > Set Categories menu is no longer causing an exception.
- An exception no longer occurs when setting parameters from the menu.
- Project X no longer crashes when drag/drop a sub-task into a task.
- Project X no longer crashes when dragging a pasted task into a subproject.
- “New Category” is no longer causing exceptions in the Summary View.
- "Save as Resource Default" button is no longer throwing exceptions after saving calendar.
Removed Features
- The Set Dates menu function has been removed.
- The "Sort By" submenu has been removed from the View menu.